← All posts
Policy

AI data centres, water and electricity: what the argument is actually about

How a data centre turns compute into heat, water and grid load, the strongest case on each side of the debate, and what an engineer can change on Monday.

AI data centre water usage comes from one physical fact: a chip doing useful work produces heat, and the heat has to go somewhere. Where it goes decides whether the bill lands on a river, on a power station, or on both. Most of the shouting about AI and the environment skips that mechanism, so this post is about the mechanism and nothing else.

I'm giving you no numbers. They vary by site and season and go stale. Understand how the heat moves and you can read any figure someone hands you and know which question it answers.

Why an AI data centre uses water at all

A processor running a model is a heater that also does arithmetic. Nearly all the electricity it draws becomes heat. Fill a hall with those and the building's main engineering problem is cooling, not computing.

There are three broad ways to remove the heat, and each shifts the cost somewhere different.

Air cooling. Fans move air across the hardware and chillers cool the air. Simple, and the most electricity-hungry option. Nothing is consumed except power.

Evaporative cooling. Warm water is exposed to air and some of it evaporates, carrying a lot of heat away cheaply. The evaporated water is gone: it leaves as vapour and never returns to the river or aquifer. This is the mechanism behind every "data centres drink water" headline.

Closed-loop liquid cooling. Coolant circulates through cold plates on the chips and back to a heat exchanger. The water is reused, so direct consumption is low. But the heat still has to be rejected, and doing that without evaporation means more chillers and pumps, so more electricity.

Water and electricity are therefore partly interchangeable. A site can spend water to save power, or power to save water. A figure that reports only one is half the story, usually the better-looking half. And the electricity has its own water cost upstream, because thermal power stations also cool with water. A data centre on a dry grid can be a heavy water user without a cooling tower on site.

The grid has to build for the worst hour

Electricity is a network balanced every second, not a tank. A data centre wants the same power at three in the morning as at three in the afternoon, every day. That flat, permanent load raises the local peak, and a grid is built for its peak. What gets built to meet it is paid off over decades by every customer on that grid, whether or not the data centre is still there.

Why they are built where they are built

An operator picks a site on cheap land, cheap power, a reliable water source, tax treatment, fibre, and a permitting process that moves quickly. Notice what that list selects for. Cheap land and quick permits are found where there is less political resistance. Cheap power and water are found where the resource is subsidised or nobody has yet had to compete for it. The conditions that attract an operator are often the conditions of a community that is already stretched, with a thin budget and a water table nobody has measured lately. The siting decision is where an abstract global question becomes a specific local one.

The strongest case that it's fine

Compute is one slice of total electricity demand, and not the largest. Heavy industry, heating, transport and ordinary buildings dwarf it.

Efficiency per unit of work improves fast. Newer hardware does more arithmetic per watt. Quantisation, distillation and better batching mean the same question costs less to answer than it did a short time ago. Freeze today's per-query cost and project it forward and you get nonsense.

And the large operators are, as a matter of public record, among the biggest buyers of new renewable generation. Their demand has financed wind and solar that would otherwise not have been built.

Read only this side and you'd conclude the issue is a moral panic.

The strongest case that it's a problem

Averages hide concentration. Compute is a small share of national demand, but it is piled into a handful of regions and a few sites. The town next door does not experience the national average. It experiences the local water permit and the local substation, and a renewable contract signed on another continent does not refill the aquifer under this one.

Disclosure is poor. Most operators report at the corporate level, if at all, and treat site-level figures as commercially sensitive. A community is routinely asked to approve a permit without seeing the resource contract it is approving.

And efficiency does not cut total consumption when demand grows faster than efficiency. The pattern where cheaper use of a resource leads to more of it being used is usually credited to the economist William Stanley Jevons, and this industry is a textbook case: every gain per query is spent at once on more queries, longer contexts, more agents, more retries.

Read only this side and you'd conclude the industry is hiding something. Sometimes it is.

My position: siting and disclosure, not AI in the abstract

"Is AI bad for the environment" is badly formed. It has no location, so it has no answer. The useful questions are local and boring: what does this site draw, from where, in which month, and who signed the contract.

So the argument should be about siting and disclosure. A community should be able to read the water and power agreement before the permit is granted, not after: the cooling design, the expected draw in the dry months, the grid upgrades and who pays. That's the disclosure we'd expect of a brewery or a steel mill, and it is the only thing that makes the "it's fine" argument checkable.

Disclosure also fixes the incentive. An operator that must publish site-level water consumption has a reason to choose closed-loop cooling or a wetter region. One that reports a global average has none.

What an engineer can actually change

Most of us don't site data centres. We write the code that runs in them, and there is still a lever. It's the same one we use for cost.

Measure the resource cost of a feature before you ship it. If it calls a model, know how many tokens it moves per user per day. Energy is roughly proportional to compute spend, so you need no new dashboard, only the habit of looking at the one you have. The post at /blog/what-is-an-llm/ covers why token count is the quantity that matters.

Cache. A surprising amount of model traffic is the same question asked again because nobody kept the result.

Don't run a model where a regex would do. Detecting a phone number, validating a postcode, extracting a date in a known format: these are solved problems with microsecond solutions. Reaching for a transformer because it's the tool on the bench is a design smell, and also a load on somebody's river. If you're not sure what the model does that a simpler tool couldn't, the explanation of attention at /blog/what-is-a-transformer/ will tell you whether you need it.

Pick the smallest model that passes your evaluation, and set a token budget and treat exceeding it as a bug. None of this fixes siting, but it's the part of the problem inside your editor, and the greener option is nearly always the cheaper one.

So, if a data centre were proposed in your district tomorrow, what single document would you want published before the vote?

Frequently asked questions

Why do AI data centres use water instead of just fans?

Evaporating water removes heat far more cheaply in electricity than running chillers, but the evaporated water leaves the local supply for good. Sites in cool regions can lean on air and closed loops; sites in hot, dry regions are tempted toward evaporation exactly where water is scarcest.

Does closed-loop cooling solve the water problem?

It mostly solves direct water use on site, since the coolant is reused. It doesn't solve electricity, because rejecting heat without evaporation needs more power, which may come from a thermal station using water upstream. It moves the cost rather than removing it.

Isn't AI a tiny share of total energy use?

Nationally, yes. The issue is concentration: a small national slice can be a very large local one. The useful figure is the site's draw as a fraction of the local grid and watershed, which is the figure most rarely published.

What should I ask about a data centre proposed near me?

Ask for the water and power agreements, the cooling design, the expected consumption in the driest month, and who pays for grid upgrades. Ask whether site-level figures will be published every year. If the answer is that they're commercially confidential, that is itself an answer.

Policy
Careers

AI detectors are failing students, and the fix is not a better detector

Why an AI detector false positive cannot be disproved from the text alone, what a wrongly flagged student should do, and why the real fix is how we assess.

Why the company threatens the person who reported its bugPolicy

When responsible disclosure gets you a lawyer's letter

Why a company threatens the person who reported its bug, why the researcher is still partly right, and the procedural fix on both sides that makes the letter unnecessary.

Policy

Is AI safety alarmism, or are we underreacting?

Both camps have a real case. A founder's answer: split AI safety into what you can test this quarter and what you cannot, and treat the first half as ordinary security work.